Case Study: SGA2024005

Peak Demand Optimization

Through EMS

Aligning solar generation with peak loads to reduce costs and grid reliance.

Peak Demand Optimization Through EMS

Project Scope

A 2 MW BESS integrated with 0.5 MW Solar PV and supported by a diesel generator required an advanced EMS to minimize peak demand charges, align solar output with high-demand periods, and enable automated demand response for greater flexibility.

SGA Solution

Smart Grid Analytics deployed an intelligent EMS that synchronized renewable generation with dynamic demand patterns through:

• Real-time load monitoring and control for precise demand shaping

• Automated demand response to optimize peak shifting and energy usage

• Predictive solar utilization algorithms to maximize on-site self-consumption

Outcome

The deployment delivered tangible operational and economic benefits:

• Lower peak demand charges and reduced overall energy costs

• Increased solar utilization with minimal grid dependence

• Smart, flexible load control enabled by automated demand response

• A strong demonstration of how intelligent EMS solutions can make solar generation more cost-effective by matching production with real-time demand.