Loading

Loading ...

Case Study: SGA2024004

Solar-Prioritized

EMS for Grid Compliance

An advanced Energy Management System (EMS) designed to optimize solar charging, peak shaving, and grid-code compliance.

Solar-Prioritized EMS for Grid Compliance

Project Scope

A 5 MW BESS integrated with 16 MW Solar PV required an intelligent EMS to ensure solar-only charging, smooth peak demand, and maintain active/reactive power compliance with grid standards.

SGA Solution

Smart Grid Analytics implemented a solar-first EMS equipped with grid-compliant intelligence:

• EMS Controller for BESS charging, load management, and solar curtailment

• Peak shaving and shifting algorithms to optimize demand response and energy costs

• Active/reactive power control to ensure regulatory compliance and stable grid operation

Outcome

The deployment delivered a reliable, compliant, and efficient solar-prioritized EMS:

• Solar-charged storage minimizing grid dependency

• Smoothed demand curves through intelligent peak shaving

• Stable, optimized renewable dispatch with full grid-code compliance

• A clear demonstration that solar-first EMS solutions can achieve both operational efficiency and regulatory alignment in emerging markets.